Laserfiche WebLink
l L Permanent Accomplished on west outslope of crusher platform. @ was interseeded <br />to the permanent mix in March of 2005. This area will be monitored for weeds <br />and mowed as needed. <br />12. Upcoming Temporary Reseed area. This topsoil and clay storage area will be <br />interseeded in order to improve cover. <br />13. This area has been backfilled, and will be covered with clay and soil in 2005. <br />After soil placement, seeding of the area will begin as backfill progresses further <br />into the limestone pit <br />14. Upcoming clay and soi[ placement area. Small part of area may remain <br />moderately disturbed resulting from a quarry haul road in the area. Area will be <br />ready for temporary seeding after soil is placed over the backfilled area. <br />15. Topsoil storage area. This area will be used for future storage of clay and topsoil <br />in the upcoming year. <br />l6. Topsoil storage area. Area will be a topsoil salvage and storage area in the <br />upcoming year. <br />17. This area will remain the backfill source and storage area in the future. <br />l8. This area will be a clay and soil salvage and storage area for the future. Will also <br />bean area of backfill storage. <br />