Laserfiche WebLink
1. Permanent Seeding Accomplished and all native vegetation seed mixture was <br />planted in Mazch 2005 <br />2. Permanent Seeding Accomplished on this area. All natural vegetation seed <br />mixture was planted in March 2005. <br />Temporary Seeding Accomplished on this visual berm with all natural vegetation <br />seed mixture in March of 2005. This berm had been previously seeded with the <br />native seed mix, but was overwhelmed by cereal ryegrass. Stope on the berm was <br />lessened so machinery could safely be negotiated and subsequently mowed. It is <br />uncertain whether this berm will be permanent or will be removed during final <br />reclamation. <br />4. Temporary Seeding with atl native vegetation seed was accomplished in March <br />2005 on this topsoil and clay storage azea. This area had been previously seeded, <br />but suffered of severe cereal rye infestation. The area was mowed in February <br />2005 and again in July 2005 in order to eliminate the contamination. Upcoming <br />spraying will occur to further control cereal rye growth, and the area will be <br />continually monitored to prevent future infestation. <br />Temporary Seeding Acwmplished. This area was originally seeded in 2001, but <br />was overwhelmed with cereal rye infestation shortly thereafter. The area was <br />mowed in Febnaary of 2005 and again in July 2005 in order to eliminate further <br />cereal rye growth. Area is scheduled for spraying in order to completely kill <br />cereal rye in the upwming yeaz. The area will be monitored and continually up <br />kept in order to prevent future cereal rye growth. <br />6. Temporary Accomplished Seeding on graded pit backfill. Area was ripped to a <br />depth of IZ inches and was seeded with aii native vegetation. The temporary seed <br />mix was sown into the ReGreen standing dead in late fall 2004. Area was atso <br />mowed in order to prevent cereal rye from setting seed. <br />7. Undisturbed Area. This is the location of the power plant and the area was never <br />disturbed by quarry activities. <br />8. Permanent Accomplished on crusher platform northwest outslope. The area was <br />mowed in order to prevent cereal rye from setting seed. It was seeded in 2001. <br />9. Permanent Accomplished on the south end of"limestone ridge." This will be <br />continually monitored for weed problems and the need to be mowed. <br />10. Permanent Accomplished at very tip of south "limestone ridge " Area was ripped <br />6 inches to relieve possible soil compaction ,and approximately 6 inches of <br />growth medium was brought from elsewhere to topdress the area. Area was <br />seeded to ReGreen and later the permanent mix in Mazch of 2005. <br />