Laserfiche WebLink
<br /> <br />BATTLE MOUNTAIN RESOURCES, INC. <br />TO: Steffen, Robertson, and Kirsten, (US) - <br />3232 South Vance Street A~inernouNwN <br />Lakewood, Co 80227 DCOMPANV <br />Attn Mr. Dave Hallman <br />FROM: Mike Young <br />DATE: October 22, 1993 <br />RE: San Luis Tailings Impoundment Construction <br />Dear Mr. Hallman: <br />Serrot Corp. has notified BMRI that liner shipments from Gundle <br />will not occur in a timely manner to ensure completion of the <br />synthetic liner deployment. Serrot Corp. proposed to manufacture a <br />VLDPE product that is slightly thicker than the 40 mil VLDPE <br />currently supplied by Gundle. The proposed thickness of the Serrot <br />product will be between 50 and 60 mil. This product would surpass <br />the 40 mil specifications for puncture resistance, elongation, tear <br />strength, etc. This product would actually upgrade the liner <br />resistance to damage compared to the 40 mil. Approximately 500,000 <br />square feet of this material would be used. <br />Please advise as soon as possible if this material would be <br />suitable. <br />Sincerely, <br />Mike R. our>~' <br />TECHNICAL SUPERINTENDENT\ CONSTRUCTION MANAGER <br />cc. Larry Oehler - Division of Minerals And Geology <br />Ken A. Kluksdahl - BMRI <br />Andre Douschane - BMG <br />A,SUBSlDIABY O{' BAITLP MOUA7Al,V GOLD COMPANY <br />P.O. BOX 3111 S.4N LUIS. COLORADO 8 1 1 52 03 10 (719) 67?-336? FAX 1719) 67?-3363 <br />