My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP18324
DRMS
>
Back File Migration
>
Report
>
REP18324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:47:12 PM
Creation date
11/27/2007 2:22:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Report
Doc Date
2/28/2002
Doc Name
2001 AHR & ARR Page 66 to Page 132
From
Coors Energy Company
To
DMG
Annual Report Year
2001
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• RECLAMATION REPORT <br />The aerial survey, optical scanning and digitizing services for the 2001 AHR <br />Report were again contracted to Cooper Aerial Survey Company of Tucson, <br />Arizona and to BE&K/Terranext, LLC (Ten-anext) of Lakewood, Colorado. <br />No additional acreage was "disturbed" during 2001. The primary focus of <br />the reclamation effort was the complete rework of an area of 12.6 acres <br />located south of Sediment Pond 2. This parcel was originally seeded in <br />1995, and then interseeded in 1998. However, a combination of factors <br />including: cheat grass, rodent activity, lack of organic material and possibly <br />too much topsand, minimized the success of previous attempts to establish <br />the reclamation seed mix. This area was burned in the spring, to control and <br />kill as much cheat grass as possible. In late summer it was disked <br />thoroughly to dislodge the rodent population and breakup the top layer in <br />preparation for a new seedbed. Then Biocomp (A-1 Organics) was added <br />and the ground was disked again. The reclamation seed mix was planted on <br />. 11/16/01. <br />In addition, topsanding (the placement of 2 feet of topsand) was completed <br />on a narrow band of approximately 3.9 acres in the southeast corner of B-Pit. <br />This area was covered with a combination of Biocomp and manure. It will <br />await completion of additional topsanding work in the area of south B-Pit <br />during 2002, then be seeded in 2003. <br />These parcels are identified on the Existing Surface Features and Utilities <br />Map (page I33) or on the Vegetation/RevegetationMap (page 135). Because <br />the primary focus was on rework of previously reclaimed acreage, the 2001 <br />reclamation summary is unchanged from the previous year. <br />RECLAMATION ACREAGE SUMMARY <br />Total area remaining to be reclaimed 234.3 acres <br />Total area reclaimed and revegetated 221.5 acres <br />Grand Total 455.8 acres <br />AHR 2001 -123- <br />
The URL can be used to link to this page
Your browser does not support the video tag.