My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP18095
DRMS
>
Back File Migration
>
Report
>
REP18095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:47:01 PM
Creation date
11/27/2007 2:18:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Report
Doc Date
6/7/2002
Doc Name
2002 Annual Report
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Site Reclamation Activity <br />April 2001 - March 2002 <br />Page 4 <br />Planned activity for 2002 includes; <br />1) refilling to grade any subsidence of the Lake Emma backfill. <br />2) monitoring and maintenance of the planted areas. <br />TAILINGS POND No.4 - Plate No. 3 <br />During the 2001 reporting year no additional acreage was disturbed <br />or reclaimed. <br />Activity at this site consisted of; <br />1) usage for containment of material removed from the <br />American Tunnel water treatment settling ponds. <br />2) monitoring and maintenance of the vegetation. This included <br />spreading organic material (steer manure) to enhance <br />vegetation growth and long term health. <br />Planned activity for 2002 includes; <br />1) monitoring and maintenance of the vegetation. <br />2) usage for storage of material generated by water treatment at <br />the American Tunnel. <br />3) possible storage of reclamation waste from other sites and <br />reclamation of areas brought to final grade. <br />TAILINGS POND #3 AREA - Plate No. 3 <br />Activity at this site consisted of; <br />1) maintenance of stormwater sediment catchment. <br />2) monitoring and maintenance of the vegetation. <br />Planned activity for 2002 includes; <br />i) monitoring and maintenance of vegetation. <br />2) potential improvement of drainage pathways. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.