Laserfiche WebLink
. Site Reclamation Activity <br />April 2001 - March 2002 <br />Page 4 <br />Planned activity for 2002 includes; <br />1) refilling to grade any subsidence of the Lake Emma backfill. <br />2) monitoring and maintenance of the planted areas. <br />TAILINGS POND No.4 - Plate No. 3 <br />During the 2001 reporting year no additional acreage was disturbed <br />or reclaimed. <br />Activity at this site consisted of; <br />1) usage for containment of material removed from the <br />American Tunnel water treatment settling ponds. <br />2) monitoring and maintenance of the vegetation. This included <br />spreading organic material (steer manure) to enhance <br />vegetation growth and long term health. <br />Planned activity for 2002 includes; <br />1) monitoring and maintenance of the vegetation. <br />2) usage for storage of material generated by water treatment at <br />the American Tunnel. <br />3) possible storage of reclamation waste from other sites and <br />reclamation of areas brought to final grade. <br />TAILINGS POND #3 AREA - Plate No. 3 <br />Activity at this site consisted of; <br />1) maintenance of stormwater sediment catchment. <br />2) monitoring and maintenance of the vegetation. <br />Planned activity for 2002 includes; <br />i) monitoring and maintenance of vegetation. <br />2) potential improvement of drainage pathways. <br />• <br />