Laserfiche WebLink
PHASES OF RECLAMATION <br /> Estimated Costs <br /> Area 1 Area 2 Area 3 Area 4 <br /> Planned West r-esent xE 'sting Current <br /> Reclamation Mining Area Mining Area Settling Pond Stockpile Area <br /> Functions (16 acres) (8 acres) (1 acre) (16 acres) <br /> Grading 1 ,233.44 616.72 77.09 1,233.44 • <br /> Scarifing the Graded <br /> Surface 496.32 248. 16 31.02 496. 32 <br /> Topsoil Replacement 2/ ,542 7 ,J 2,761. 18 (�_ 293. 0 <br /> 1 Soil Testing and <br /> Fertilizing 816.00 408.00 51.00 816.00 r <br /> Seeding & Mulching 6,068. 56 3,429.28 231. 16 3,698.56 <br /> Miscellaneous 0 0 2,934.02 0 <br /> TOTAL 11 ,156.99 7,463.34 3,617.80 6,244.32 <br /> GRAND TOTAL $ 28,482.45 <br />