Laserfiche WebLink
- Page 2 - <br /> • topsoiling where needed and seeding with native grasses . The area <br /> west of the reclamed portion will be used as a stockpile area. <br /> These stockpiles will be placed to provide a visual and noise <br /> screen for the Eagle Ranch Company pr rty. <br /> The location of the asphalt hot p the concrete batch plant, <br /> and the crusher during 1984 is i ted on Exhibit C. The <br /> existing haul road on the south de of the mined area will be <br /> shifted to the month and lowered to the mined elevation. This will <br /> allow reclamation of the existing steep slopes on the south side of <br /> the mined area. This steep area will be recontoured on a 2 : 1 slope, <br /> topsoiled and seeded. <br /> In the future, as the mining extends to the west and room is <br /> provided for equipment and stockpiles, the entire operation will <br /> shift to the west. <br /> QUANTITATIVE INFORMATION <br /> The following indicates the material mined year by year from 1980 : <br /> YEAR TONS OF <br /> MATERIAL LOADS <br /> I <br /> • 1980 33, 000 1740 <br /> 1981 12, 770 672 <br /> 1982 19, 800 1042 <br /> 1983 30, 000 1580 <br /> The most recent year can be further analyzed as follows : <br /> MONTH LOADS/MONTH AVERAGE <br /> LOADS/HOUR* <br /> January 23 0. 14 <br /> February 13 0. 08 <br /> March 62 0. 34 <br /> April 103 0. 61 <br /> May 272 1. 55 <br /> June 289 1. 64 <br /> July 308 1. 83 <br /> August 110 0. 60 <br /> September 192 1 . 09 <br /> October 204 1 . 21 <br /> November 4 0. 22 <br /> December 0 0. 00 <br /> *Average Loads Per Hour was determined by : Loads per month <br /> (working days per month X 8 hours per day) . <br /> • <br />