Laserfiche WebLink
/Nm"kAnWJhw"&.1ond._(urv*".co* III IIIIIIIIIIIII 111 <br /> p•o• bon 14 Nr,WerWe 80W U40414 04&&W <br /> 406 0.hyww SQUOM sullo 0-1 <br /> OW6 o lo spdn9e,oondo 81601 <br /> RECEIVED <br /> March 7 , 1984 APR 0 9 1984 <br /> Mr. James Rubin �1 MINED LAND RECLAMATION DIVISI&I <br /> Eagle County Department +�of Community Development Colo. Dept. of Natural Resources <br /> Eagle, CO 81631 <br /> RE: Nottingham Sand and Gravel Company - Eagle Pit <br /> Dear Jim: <br /> This letter is submitted to address concerns your staff has <br /> with the recently submitted Environmental Impact Report. <br /> 1) . Concerns with phasing, area to be mined this year and <br /> the area to be ultimately mined. <br /> Please refer to the attached Exhibit C Revised. The area <br /> currently mined is indicated. The long range plan is to mine <br /> from the west end of this area all the way to the western <br /> project boundary. After this area is mined, the mining will <br /> then commence at the east end of the currently mined area and <br /> proceed eastward to the east property limit or until it <br /> becomes uneconomical to mine due to the narrowness of the <br /> property. <br /> It is anticipated that no more than five acres will be mined <br /> this year. This is indicated on Exhibit C. However, if an <br /> unusual volume of sales warrants a larger mining area, we would <br /> like to reserve the right to submit a request to the County <br /> for an extension of the mining area. <br /> The ultimate area to be mined is the entire area indicated by <br /> Exhibit A submitted with the Environmental Impact Report. <br /> 2) . Reclamation Plan, final contouring. <br /> The original Reclamation Plan and Typical "Final" cross-section <br /> submitted by Mr. Ron Liston, Land Design Partnership, still <br /> represent the Rehabilitation Concept for the entire site. This <br /> cross-section indicates that the area will be mined to a depth <br /> of approximately thirty feet below natural ground. This is <br /> at about the same elevation as the irrigation ditch. The <br /> finished slope along the southern property limit will be 2 : 1 as <br /> indicated. <br /> The approximate final contours are indicated by dashed lines <br /> on Exhibit A, Revised. <br />