My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-03-08_REPORT - M1977342
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977342
>
1999-03-08_REPORT - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 11:19:46 AM
Creation date
11/27/2007 2:00:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
3/8/1999
Doc Name
1998 ANNUAL REPORT 112D-3 ANNUAL REPORT HENDERSON MINE & MILL PN M-77-342
From
CLIMAX MOLYBDENUM CO
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Henderson Mine, Permit #M-77-342 <br />Site Specific Reclamation Costs <br />Page 3 <br />B. SITE SPECIFIC RECLAMATION COSTS <br />The following are estimated costs of completing the reclamatio~t of each specific site. Area <br />numbers are correlated to the original reclamation map (not included with this report). Costs are <br />1998 dollars and the numbers given below and throughout this section are thousands of dollars. <br />As in the past, a buffer represents land reserved for possibie future disturbance. <br />Mine site (172 acres) <br />a) Dismantle $ 0 <br />b) Grading and site preparation. $ 195 <br />c) Revegetate 1 16 acres (at $2,490/acre). $ 302 <br />d) Buffer, 56 acres $ 0 <br />Total... $ 497 <br />2. Vent shaft (1 acre) <br />a) Secure shaft opening. $ 58 <br />b) Fertilize (1 acre at $180/acre). $ 0 <br />Total... $ 58 <br />3. Portal area (28 acres) <br />a) Dismantle, close portal. $ 41 <br />b) Revegetate 14 acres (at $1,900/acre). $ 27 <br />c) Fertilize (25 acres at $170/acre, one application). $ 5 <br /> Total.. . $ 73 <br />4. Surface Railroad (121 acres) <br />a) Dismantle. $ 5 <br />b) Grading and site preparation. $ 75 <br />c) Revegetate RR bed (36 acres at $2,600/acre) $ 94 <br />d) Fertilize slopes (73 acres at $180/acre, 1 application) $ 13 <br />e) Buffer, 12 acres $ 0 <br />Total... $ 187 <br />5. Mill yard and access roads (123 acres) <br />a) Dismantle. $ 0 <br />b) Grading and site preparation $ 146 <br />c) Revegetate yard (95 acres at $1,900/acre) $ 181 <br />d) Buffer, 28 acres $ 0 <br />Total... $ 327 <br />
The URL can be used to link to this page
Your browser does not support the video tag.