My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-03-08_REPORT - M1977342
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977342
>
1999-03-08_REPORT - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 11:19:46 AM
Creation date
11/27/2007 2:00:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
3/8/1999
Doc Name
1998 ANNUAL REPORT 112D-3 ANNUAL REPORT HENDERSON MINE & MILL PN M-77-342
From
CLIMAX MOLYBDENUM CO
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Henderson Mine, Permit #M-77-342 <br />Reclarnation Costs <br />Page 2 <br /> <br />2. Cost per acre to reclaim areas with a subsoil growth medium such as the portal area, <br />reservoir shores, power lines, etc. <br />Activity Man <br />Days Labor/ <br />Equipment Material Total <br />Scaritication/Ripping 0.5 $460 $0 $460 <br />300 trees 2 $145 $135 $280 <br />40 shrubs 1 $170 $75 $24~ <br />Seed 0.5 $160 $180 $340 <br />Fertilizer 0.5 -' $20 $20 <br />10% Freight & Tax - - $40 $40 <br />Maintenance fertilize 3 $450 $65 $515 <br /> Total per acre... $1,900 <br />3. Cost for revege[a[ing one (1) acre of tailing. <br />X Revegetate at $1,900 (Subsoil growth medium) <br />X Top soiling ($1.60/cubic yard, 1,613 cy/acre) <br />X Liming (2 tons/acre) <br />4. Cost for revegetating one (1) acre of>Insitu=Z soil. <br />X Revegetate at $1,900 (Subsoil growth medium) <br />X Liming (2 tons/acre) <br />5. Cost per acre for maintenance fertilization. <br />X Contracted for $170 per acre including material. <br />' Included with seed application. <br />$1,900 <br />$2,540 <br />$ 250 <br />Total (per acre)...$4,690 <br />$1,900 <br />250 <br />Total (per acre)...$2,150 <br />]80 <br />Total (per acre)...$ 180 <br />'Insitu is the term coined to describe in-place soil, within the permitted disturbance, but <br />not yet inundated by tailings. As described in the 1991 amendment to the reclamation permit, this <br />soil is available as cover material up until the time when it becomes inundated with tailings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.