Laserfiche WebLink
With DMG approval 1,370,000 gallons of brine water and Pond #1 water was pumped from the <br />evaporation system collection ponds to the tailing impoundment. <br />The depth to water at BF-4 was at 25.82 feet on I/29/O1. <br />Well M-20 was pumped intermittently during the month of December. A total of 0.05 acre feet of <br />water was pumped from this well during [he month. <br />Sincer <br />David E. Long~C~ <br />Environmental Coordinator II <br />Enclosures <br />cc: Bill Lyle <br />File <br />