Laserfiche WebLink
<br />November 15, 1995 <br />1995 AHR Adequacy Response <br />Basin Resources <br />page 4 of 4 <br />11. Table C-1.1 is a figure which has been modified to agree with the data found in Table A- <br />78. <br />Surface Water <br />i ~ ~ ~ <br />1. The surface water sites CCS-1, CCS-2, CHC-1, LCS-1, PRS-2, and WCS-1 were not <br />~,S~uS sampled in March due to an oversight. <br />/ 2. Page 23 Itas been changed to accurately represent the 1995 discharge history for Pond 002. <br />The data presented in Appendix A and B are indifferent units. The reporting in Appendix <br />w A is in gallons per minute (gpm) while the data in Appendix B is in million gallons per day <br />r per NPDES permit requirements. A comparison of the two data sets in January and June <br />show similar values. <br />Please do not hesitate to call if you have any questions. Basin appreciates the granting of an <br />extension of one week for this response letter. <br />Sincerely, <br />~~~ >~~~ <br />Cathy Begej, Project Manager, Greystone <br />cc. Ron Thompson, Engineer, Basin Resources <br />Enclosures <br />