• from the borrow area to the top of the benches. A dozer or <br />track hoe was used to spread it on the slopes. Materal from <br />Pond 6 was pushed out of the pond and onto the slope with a <br />dozer. This material was placed during May and June 1994. <br />CRDA 2 benches 1 and 2. The cover requirement of 24" of non- <br />toxic noncombustible material was approved for this pile in <br />TR-16. For covering this portion of the pile we attempted to <br />place a minimum of 18" of subsoil and 6" of topsoil as <br />discussed in the TR. One foot of material was placed on the <br />road and gravel was applied to the road surface. Sources for <br />material for this subsoil cover was CBA 1 and CBA 2. Soil <br />sample information for the 2 borrow areas is the same as those <br />listed for CRDA 1. The areas covered, the average thickness <br />and the volume of material used to cover these three benches <br />is given in Table C-94. Scrapers were used for moving most of <br />this material from the borrow area to the top of the benches <br />and onto the face of part of slopes. A dozer or track hoe was <br />used to spread it on the remaining slopes. This material was <br />place during June 1994. <br />CRDA 2 benches 3 and part of 4. Work continued in the late <br />summer on aditional portions of CRDA 2 that were ready for <br />cover. Again we attempted to place a minimum of 18" of <br />subsoil and 6" of topsoil as discussed in the TR. The sources <br />• of material for subsoil was CBA 1. Soil sample information <br />for this area is the same as those listed for CRDA 1. The <br />areas covered, the average thickness and the volume of <br />material used to cover these benches is given in Table C-94. <br />Ten wheel dump trucks were used to haul the material to the <br />top and bottom of the benches. A dozer or track hoe was used <br />to spread the material on the slope. This material was placed <br />during August and September 1994. <br />Table C-94 <br />Location Area Thickness Sub-soil <br />volume <br />CRDA 1, Benches 1-3 9.5 acres 1.2' 18,390 CY <br />CRDA 2, Benches 1&2 4.2 2.0 13,550 <br />CRDA 2, Road 1.0 1.0 1,620 <br />CRDA 2, Benches 3&4 3.0 2.0 9,680 <br />Total 17.7 43,240 <br />(D) Area Topsoiled CRDA 1 benches 1, 2 and 3. The topsoil <br />placed on these benches came from Topsoil Piles Nos. 5 and 6 <br />. and a salvage area adjacent to pile 6. The average thickness <br />was not detectable during final soil depth sampling but was <br />