Laserfiche WebLink
• <br />Future Mining <br />Although not shown on the maps, future mining at this site will primarily concentrate <br />on the Phase le South and Phase 2e areas. That mining area is expected to grow by no more <br />than about 50% of its current dimensions. It may not involve all the land currently shown as <br />stripped. It is unlikely any other portion of the permit will be mined other than perhaps a small <br />amount of material removed from the gravel pit on the west side of Academy shown on Map 1 <br />as a 1.9 acre mining area. <br />Daniels Sand Pit #2 Annual Report January 7, 1997 Additional Sheets page 2 of 2 <br />