Laserfiche WebLink
-- - - -- - <br />I' <br />' Description of Work: <br />1. Establish location of Trench 1. <br />2. Determine size of turn around needed (approximately <br />40' x 60') . <br />3. Construct diversion ditches. <br />' 4. Excavate the initial portion of the trench and instal]. stop <br />blocks. <br />5. Extend access road. <br />1 6. Place signs in proper locations. <br />' Estimated time of Construction: Begin construction immediately <br />and complete all work within 2 <br />to 3 days. <br />' Cost Estimates. We estimate that construction costs for a~mpleting <br />the initia evelopment plan will be: <br />' Fuel and Labor $1,000 <br />Equipment Rental Costs 1,500 <br />Signs and Stop Blocks 300 <br />' Total Construction Costs $2,800 <br />All construction will be accomplished by the Town of Silverton <br />utilizing in house forces and equipment. <br />At present, there is no charge for using the landfill site. <br />' Silverton operates and maintains the site, including wages of the <br />operator and providing the crawler dozer, out of the Town's general <br />fund. <br />lJ <br /> <br /> <br /> <br /> <br /> <br /> _oo_ <br />