Laserfiche WebLink
• embankments near water well 90-1 and production well 90-5. Fences around <br />wells and topsoil were to limit livestock grazing during establishment of reclaimed <br />areas. <br />4.2 Off-Site Facilities <br />4.2.1 Rifle Office <br />Early in 1991, NaTec moved the Rifle office to the site. All project employees <br />work at the mine site. <br />4.2.2 Fruita Facility <br />During 1991, NaTec continued to utilize a facility near Fruita, Colorado for storage <br />and pulverizing bicarb. The majority of the material shipped from this facility was <br />• to the nearby Landmark Petroleum refinery. <br />4.2.3 Ra'I~Car Loadout at Lacv Station <br />A railcar loadout facility at Lacy Station, approximately five miles west of Rifle, <br />Colorado, was completed in 1991. The railroad will truck bicarb from the mine <br />site to the Lacy Station for railcar loading and shipping. <br />4.2.4 Corporate Office <br />NaTec continued in 1991 to maintain corporate offices in Houston, Texas with <br />sales offices in various other locations. <br />u <br />18 <br />