My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15204
DRMS
>
Back File Migration
>
Report
>
REP15204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:49 PM
Creation date
11/27/2007 1:37:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
1/29/1992
Doc Name
1991 PROJECT STATUS AND ANNUAL PLAN OF DEVELOPMENT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transmission line from Horse Draw on Piceance Creek to the plant <br />site. This supplied temporary power for NaTec's construction <br />operation. The second was the upgrade of the substation at C-b <br />Tract to 25kv and the subsequent upgrade of the transmission <br />facilities from C-b to Horse Draw to accommodate 25kv. NaTec's <br />permanent 25kv line was heated up in February, 1991. <br />b. Project water needs continue to be met by the raw water well <br />completed in May, 1990. Water from the well is fed to the raw water <br />storage tank at the plant which has a storage capacity of 100,000 <br />gallons (30,000 gallons of which is reserved for fire protectionl. The <br />water is then processed through our water softening system before <br />use as process water; either as plant water or as barren liquor <br />. makeup. <br />c. The access road was completed in May, 1991, with the addition of a <br />double-course chipseal. The road is 3.2 miles long and 24 feet wide. <br />The ROW was assigned to Rio Blanco County by the BLM on <br />December 13, 1991. <br />d. Potable water is provided in bottles from off-site sources. <br />e. Domestic sewage is handled by a septic tank and leach field system. <br />f. Process instrument air is provided by an on-site compressor. <br />g. Most heat removed in the cooling crystallization is recycled into the <br />barren liquor. The remainder is passed to the atmosphere by the <br />• evaporative cooling tower. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.