Laserfiche WebLink
• d. Review Skyline #1 and Cross V well status for potential reentry and <br />reabandonment. <br />e. Reclamation of three topsoil stockpiles and other minor disturbed <br />areas. <br />f. Mine 25,000 tons 160°~ complete) from Cavity #1. <br />g. Sonar survey Cavity #1 when 60% has been mined. <br />h. Conduct mechanical integrity tests on the wells associated with <br />Cavity #1. <br />_. <br />i. Mine Cavity #2 and possibly #3 concurrently with Cavity #1. <br />• 3.2.2 Actual 1991 Production and Activities <br />The following was accomplished in 1991: <br />a. Finished construction, with contractors off site early in the year. <br />b. Initiated Cavity #1 mining and plant production in February. <br />c. Cavity #2 and #3 well pairs were not drilled. <br />d. IRI-5 was recompleted to a Perched aquifer monitor well. <br />e. The status of Skyline #1 and Cross V well for reentry and <br />abandonment remains under investigation. <br />• f. Laydown areas, livestock waterline and other areas were seeded. All <br />topsoil areas were fenced. <br />8 <br />