My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15204
DRMS
>
Back File Migration
>
Report
>
REP15204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:49 PM
Creation date
11/27/2007 1:37:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
1/29/1992
Doc Name
1991 PROJECT STATUS AND ANNUAL PLAN OF DEVELOPMENT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lease C-37474 <br />T.1S.. R.98W.. 6th P.M. <br />Sec. 16, N1/2 NE1/4, SW1/4 NE1/4, W1/2, and NW1/4 SE1/4; <br />Sec. 17, (all-; <br />Sec. 20, NE1/4 NE1/4; <br />Sec. 21, NW 1 /4 NW 114. <br />The area described contains 1200 acres. <br />The total area contained within the four sodium leases is 8,358.14 acres. <br />The location of the principle operation is: T.15., R.98W., Section 26. The access <br />road crosses portions of Sections 25, 26, 35 and 36 of T.1 S., R.98W and Section <br />31, T.1S., R.97W. and Section 6, T.2S., R97W. Figure 2-1 shows the four <br />sodium lease tracts, plant site, access routes for road and power and monitoring, <br />• water and production wells. <br />2.3 Leasehold Status <br />The sodium leases were issued July 1, 1971. Following exploration drilling and <br />bulk sampling by solution mining, permit applications to allow construction and <br />operation of a 3ton-per-hour (TPH) pilot solution mining facility were submitted on <br />October 4, 1983 and approved February 9, 1984. On May 2, 1986, an EA fora 6 <br />TPH pilot-scale operation was approved by the BLM. On November 20, 1987 the <br />BLM approved NaTec's Mine plan for acommercial-scale (125,000 TPY) nahcolite <br />solution mine. Construction started in May, 1990 for the facilities. A 1990 <br />Project Status and Annual Plan of Development report was submitted to the BLM <br />on December 26, 1990. This annual report is a requirement of the Lease and <br />• Record of Decision (ROD). On January 17, 1991, a revised mine plan was <br />submitted to the BLM with approval January 31, 1991. An updated monitoring <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.