Laserfiche WebLink
Dan Mathews - 7 - January 27 2003 <br />23. Substations B -Superstructures, fences, slabs and components <br />removed during 2002. Graded to approximate original contours and <br />reseeded. Located in the SE'/a Section 34, Township 10 South, Range 98 <br />West, 6`h P.M. <br />Area - 0.3 <br />Date -November 2002 <br />24. 2 West Portals -Substation of portal areas.Reference Exhibit 58. <br />Located in the NE'/<, Section 11, Township 11 South, Range 98 West, 6`h <br />P.M. <br />Area - 0.7 Acres <br />Date -December 2001 <br />25. Cameo Refuse Disposal Area Topsoil Piles -These piles were used for <br />topsoiling the CRDA2 during final reclamation activities. Located in the <br />SE'/<, Section 28, Township 10 South, Range 98 West, 6`h P.M. <br />Area - 2.9 Acres <br />Date -April 2002 <br />(g) Vegetation Studies -None during 2002. <br />(h) Other -Cover material for CRDA2 was also taken from Coal Creek and the <br />removal of check dam structures. The creek was excavated uniformly and at a <br />straight grade from the dip section across Coal Creek to the culverts at Haul <br />Road 4, and then the cut slope banks were reseeded and rip-rapped where <br />needed. <br />Sincerely, <br />,~gC>~~ <br />J. E. Stover, P. E.. <br />Consulting Engineer <br />