Laserfiche WebLink
Dan Mathews - 6 - January 27 2003 <br />18. Cameo Refuse Disposal Area No. 1 - Re-contoured upper bench, <br />regraded the top of the pile, covered all slopes, benches and the top of <br />the pile with 24 inches of material. Established collection ditches and rip- <br />rapped the ditches in accordance with the reclamation plan. This pile was <br />seeded during April 2002. Located in the SE'/<, Section 28, Township 10 <br />South, Range 98 West, 6`h P.M. <br />Area - 15.4 Acres <br />Date -April 2002 <br />19. Cameo Refuse Disposal Area No. 2 -The final reclamation of this refuse <br />pile included covering and topsoiling the upper benches and the top of <br />the pile. Also a new diversion ditch was constructed just above the pile. <br />The Old Upper diversion ditch was reclaimed and restored to approximate <br />original contours and then reseeded. Located in the SE'/<, Section 28 <br />and the SW'/<, Section 27, Township 10 South, Range 98 West, 6'h P.M. <br />Area - 19.8 Acres <br />Date -April 2002 for CRDA2 and November 2002 for Upper Diversion <br />20. Cameo Borrow Area No. 2 -Material was excavated from CBA2 for the <br />covering of the CRDA1. A further disturbance will be needed here at the <br />removal of Pond 11. Located in the SE'/a, Section 28, Township 10 <br />South, Range 98 West, 6'" P.M. <br />Area - 5.1 Acres <br />Date -April 2002 <br />21. Access Road and Powerlines to No. 2 West Portals - By agreement <br />with the Bureau of Land Management, the access road was left in place. <br />The Powerline reclamation was finished during 2002. <br />Area - 3.8 Acres <br />Date -July 2002 <br />22. Roadside North Portal Mine Facilities and Stockpile Area -All <br />structures, materials and facilities were removed. The portal decline was <br />filled and the area was returned to approximate original contours and then <br />reseeded. Located in the SW'/o Section 27, Township 10 South, Range <br />98 West, 6"' P.M. <br />Area - 24.8 Acres <br />Date -November 2002 <br />