My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15140
DRMS
>
Back File Migration
>
Report
>
REP15140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:46 PM
Creation date
11/27/2007 1:36:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
3/19/1999
Doc Name
BATTLE MOUNTAIN RESOURCES INC SAN LUIS PN M-88-112 1998 ANNUAL REPORT
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Areas of Disturbance <br />The following is a summary of the areas of disturbance at the San Luis Project: <br />Permitted Actual Under Reclamation <br />Area Disturbance Disturbance Reclamation done 1998 <br />East Pit 20 acres 20 acres 20 acres <br />West Pit 110 100 100 <br />Waste Rock A 0 0 0 <br />Waste Rock B 18 18 18 <br />Waste Rock C 30 28 28 <br />Waste Rock D 42 42 42 <br />South Waste Rock 50 35 35 <br />Mill Area 26 26 4 <br />ESI Heap 8 8 8 <br />Test Heap 10 10 0 <br />Borrow Area 11 10 0 <br />Roads 30 20 8 <br />Tailings Area 192 192 158 <br /> <br />78 <br />Total Area 547 acres 509 acres 413 acres 78 <br />Site Monitoring and Reporting <br />Quarterly water sampling in accordance with TR-O6 QA/QC, took place in January, April, July, <br />and October. Analysis reports were submitted to DMG upon receipt from the analytical lab. <br />During the third quarter sampling at monitor well M-11 R (July 08, 1998), an exceedance of the <br />permitted total dissolved solid (TDS) value was detected. Verification sampling was conducted <br />on 8/10!98, 8/20/98 and 8/27/98 in accordance with the Division. Each of the verification sample <br />results exceeded the permitted TDS value. In accordance with TR-15, a response plan was <br />prepared and submitted to the Division on September 24, 1998 addressing investigative and <br />response actions proposed with monitor well M-1 i R, Voluntary initiation of additional <br />groundwater monitoring proposed in the response plan was conducted by BMRi, while CDMG <br />continued review and comment on the submitted response plan. Analytical results received from <br />the additional monitoring identified possible alternate constituent sources than those identified in <br />the response plan. In addition BMRI conducted further field investigation of the West Pit area and <br />
The URL can be used to link to this page
Your browser does not support the video tag.