My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP14132
DRMS
>
Back File Migration
>
Report
>
REP14132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2012 1:04:00 PM
Creation date
11/27/2007 1:23:04 AM
Metadata
Fields
Template:
IMP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Bob Nondorf, Purchasing Division <br />From: Bruce Stover, Division of Mines and Geology <br />Date: November 6, 1992 <br />Re: Change Order Justification, Poverty Gulch /Tenderfoot <br />RN- Mines -292, P.O. No. C -65913 <br />As we discussed in the confirming phone conversation of September <br />30, 1992, we are proposing to add two additional mine closures to <br />the Poverty Gulch /Tenderfoot Purchase Order. These mine openings <br />are located at the heavily visited Mollie Kathleen Tourist Mine, <br />and are custom closures to allow for proper ventilation, while <br />safegaurding the vertical shaft openings. We originally intended <br />to bid these closures out next year after the tourist season <br />according to the landowners wishes, however, the situation has <br />changed, and the landowner would like to safegaurd the shafts this <br />fall. <br />Rather than bid out this job separately, and incur the costs of the <br />bidding process and re- mobilization of equipment we already have <br />working, it would be in the best interests of the State to reduce <br />overall costs by adding these closures to the existing Purchase <br />Order Contract. The contractor's schedule will permit this <br />additional work, and he is willing to do it immediately. Please <br />note that since drawing up the Change Order with the original <br />estimates for the additional work, we have been forced to reduce <br />our scope of work due to land owner /lessee constraints. The <br />present additional amount reflects this latest change. <br />Due to extremely competitive bidding on the presently active <br />Poverty Gulch/ Tenderfoot project, we were able to contract the work <br />for much less than our own estimate. This low overall job cost <br />means that adding the additional work outlined above will result in <br />a purchase order increase of around 17 percent. If the job had <br />been contracted for an amount closer to our original estimate, the <br />increase would be less than 13 percent. <br />Based on these considerations, we are requesting approval for a <br />change order to add this work to the current Poverty <br />Gulch /Tenderfoot Project. <br />If you have any questions or require more information, give me a <br />call. <br />
The URL can be used to link to this page
Your browser does not support the video tag.