My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP14132
DRMS
>
Back File Migration
>
Report
>
REP14132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2012 1:04:00 PM
Creation date
11/27/2007 1:23:04 AM
Metadata
Fields
Template:
IMP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF MINERALS AND GEOLOGY <br />Department of .Natural Resources <br />1313 Sherman St.. Room 2 I.S <br />Denver, CO 80203 <br />Phone: (303) 866.356' <br />FAX: 13031832 -810b <br />STATE OF COLOSADO <br />To: Bob Nondorf, Purchasing Division <br />From: Bruce Stover, Division of Minerals and Geolog� <br />Date: November 6, 1992 <br />Re: Change Order Justification, Poverty Gulch/Tenderfoot <br />RN- Mines -292, P.O. No. C -65913 <br />f ;p�P•nUr <br />.MrLhiel B 'long <br />D...vun Imecor <br />As we discussed in the confirming phone conversation of September 30, 1992, we are proposing <br />to add two additional mine closures to the Poverty Gulch/Tenderfoot Purchase Order. These mine <br />openings are located at the heavily visited Mollie Kathleen Tourist Mine, and are custom closures to <br />allow for proper ventilation, while safeguarding the vertical shaft openings. We originally intended <br />to bid these closures out next year after the tourist season according to the landowners wishes, <br />however, the situation has changed, and the landowner would like to safeguard the shafts this fall. <br />Rather than bid out this job separately, and incur the costs of the bidding process and re- <br />mobilization of equipment we already have working, it would be in the best interests of the State to <br />reduce overall costs by adding these closures to the existing Purchase Order Contract. The <br />contractor's schedule will permit this additional work, and he is willing to do it immediately. Please <br />note that since drawing up the Change Order with the original estimates for the additional work, <br />we have been forced to reduce our scope of work due to land owner /lessee constraints. The <br />present additional amount reflects this latest change. <br />Due to extremely competitive bidding on the presently active Poverty Gulch/Tenderfoot project, we <br />were able to contract the work for much less than our own estimate. This low overall job cost <br />means that adding the additional work outlined above will result in a purchase order increase of <br />around 17 percent. If the job had been contracted for an amount closer to our original estimate, <br />the increase would be less than 13 percent. <br />Based on these considerations, we are requesting approval for a change order to add this work to <br />the current Poverty Gulch/Tenderfoot Project. <br />If you have any questions or require more information, give me a call. <br />BKS /yjb <br />m:\imp\bks\mollia.wp <br />
The URL can be used to link to this page
Your browser does not support the video tag.