Laserfiche WebLink
Poverty Gulch /Gold Hill Project -- REVISED BID SCHEDULE Pg 2 of 2 <br />ID <br />Feature <br />Closure Method <br />Bid Amount <br />u� <br />381 <br />Shaft <br />Panel, 7 (B) Panels <br />$�5,5:� <br />B -381 <br />Shaft <br />Polyurethane, 13 Cu. Yds. <br />1 /36� <br />382 <br />Shaft <br />Panel, 3 (B) Panels <br />736 `� <br />383 <br />Shaft <br />Panel, 3 (B) Panels <br />384 <br />Shaft <br />Panel, 2 (B) Panels <br />385 <br />Shaft <br />Panel, 2 (B) Panels <br />386 <br />Shaft <br />Backfill, 133.0 Cu. Yds. <br />387 <br />Shaft <br />Panel, 2 (B) Panels <br />bn` <br />388 <br />Shaft <br />Backfill, 133.0 Cu. Yds. <br />389 <br />Shaft <br />Backfill, 35.0 Cu. Yds. <br />R <br />,3U O <br />390 <br />Shaft <br />Backfill, 30.0 Cu. Yds. <br />391 <br />Shaft <br />Backfill, 78.0 Cu. Yds. <br />y -40 <br />392 <br />Shaft <br />Backfill, 272.0 Cu. Yds. <br />G� <br />393 <br />Shaft <br />Panel, 2 (B) Panels <br />394 <br />Shaft <br />Polyurethane, 11 Cu. Yds. <br />x/96 <br />395 <br />Shaft /Pit <br />2 culverts w/ access, backfill <br />- 7,6 "' <br />396 <br />Shaft <br />Panel, 3 (B) Panels <br />( O "� <br />397 <br />Shaft <br />Panel, 3 (B) Panels <br />'7,35` <br />398 <br />Shaft <br />Backfill, 133.0 Cu. Yds. <br />T <br />/n <br />399 <br />Shaft <br />Polyurethane, 10 Cu. Yds. <br />Q I uO` <br />400 <br />Shaft <br />Polyurethane, 15 Cu. Yds. <br />401 <br />Shaft <br />Backfill, 100.0 Cu. Yds. <br />402 <br />Shaft <br />Panel, 9 (B) Panels, two C -1 beams <br />403 <br />Shaft <br />Backfill, 33.0 Cu. Yds. <br />< 12 Q ° <br />404 <br />Shaft <br />Backfill, 100.0 Cu. Yds. <br />y,3O�� <br />405 <br />Shaft <br />Panel, 2 (B) Panels <br />406 <br />Shaft <br />Panel, 3 (B) Panels <br />407 <br />Shaft <br />Polyurethane, 7 Cu. Yds. <br />408 <br />Shaft <br />Panel, 2 (B) Panels <br />409 <br />Shaft <br />Panel, 2 (B) Panels <br />410 <br />Shaft <br />Panel, 4 (B) Panels, 1 C -1 beam <br />o ;° <br />411 <br />Shaft <br />Polyurethane, 7 Cu. Yds. <br />412 <br />Shaft <br />Backfill, 43.0 Cu. Yds. <br />413 <br />Shaft <br />Backfill, 47.0 Cu. Yds. <br />3r.� <br />414 <br />Shaft <br />Panel, 1 (B) Panels <br />7S r <br />415 <br />Shaft <br />Panel, 2 (B) Panels <br />'/_b o <br />416 <br />Shaft <br />Panel, 2 (B) Panels <br />p - <br />417 <br />Shaft <br />Panel, 2 (B) Panels <br />418 <br />Shaft <br />Backfill, 50.0 Cu. Yds. <br />419 <br />Stope Stope <br />Backfill, 250.0 Cu. Yds. <br />lqqS . <br />428 <br />Shaft <br />Monolithic Plug, 9 Cu. Yds. <br />1 S/0 <br />429 <br />Stope <br />Panels, 10 (B), 2 C -1 Beams <br />6Sr <br />Enter <br />TOTAL here and <br />on Bid Schedule, pg 1 item 2 <br />m_ <br />$ 8, 08 6 <br />