Poverty Gulch /Gold Hill Project -- REVISED BID SCHEDULE Pg 2 of 2
<br />ID
<br />Feature
<br />Closure Method
<br />Bid Amount
<br />u�
<br />381
<br />Shaft
<br />Panel, 7 (B) Panels
<br />$�5,5:�
<br />B -381
<br />Shaft
<br />Polyurethane, 13 Cu. Yds.
<br />1 /36�
<br />382
<br />Shaft
<br />Panel, 3 (B) Panels
<br />736 `�
<br />383
<br />Shaft
<br />Panel, 3 (B) Panels
<br />384
<br />Shaft
<br />Panel, 2 (B) Panels
<br />385
<br />Shaft
<br />Panel, 2 (B) Panels
<br />386
<br />Shaft
<br />Backfill, 133.0 Cu. Yds.
<br />387
<br />Shaft
<br />Panel, 2 (B) Panels
<br />bn`
<br />388
<br />Shaft
<br />Backfill, 133.0 Cu. Yds.
<br />389
<br />Shaft
<br />Backfill, 35.0 Cu. Yds.
<br />R
<br />,3U O
<br />390
<br />Shaft
<br />Backfill, 30.0 Cu. Yds.
<br />391
<br />Shaft
<br />Backfill, 78.0 Cu. Yds.
<br />y -40
<br />392
<br />Shaft
<br />Backfill, 272.0 Cu. Yds.
<br />G�
<br />393
<br />Shaft
<br />Panel, 2 (B) Panels
<br />394
<br />Shaft
<br />Polyurethane, 11 Cu. Yds.
<br />x/96
<br />395
<br />Shaft /Pit
<br />2 culverts w/ access, backfill
<br />- 7,6 "'
<br />396
<br />Shaft
<br />Panel, 3 (B) Panels
<br />( O "�
<br />397
<br />Shaft
<br />Panel, 3 (B) Panels
<br />'7,35`
<br />398
<br />Shaft
<br />Backfill, 133.0 Cu. Yds.
<br />T
<br />/n
<br />399
<br />Shaft
<br />Polyurethane, 10 Cu. Yds.
<br />Q I uO`
<br />400
<br />Shaft
<br />Polyurethane, 15 Cu. Yds.
<br />401
<br />Shaft
<br />Backfill, 100.0 Cu. Yds.
<br />402
<br />Shaft
<br />Panel, 9 (B) Panels, two C -1 beams
<br />403
<br />Shaft
<br />Backfill, 33.0 Cu. Yds.
<br />< 12 Q °
<br />404
<br />Shaft
<br />Backfill, 100.0 Cu. Yds.
<br />y,3O��
<br />405
<br />Shaft
<br />Panel, 2 (B) Panels
<br />406
<br />Shaft
<br />Panel, 3 (B) Panels
<br />407
<br />Shaft
<br />Polyurethane, 7 Cu. Yds.
<br />408
<br />Shaft
<br />Panel, 2 (B) Panels
<br />409
<br />Shaft
<br />Panel, 2 (B) Panels
<br />410
<br />Shaft
<br />Panel, 4 (B) Panels, 1 C -1 beam
<br />o ;°
<br />411
<br />Shaft
<br />Polyurethane, 7 Cu. Yds.
<br />412
<br />Shaft
<br />Backfill, 43.0 Cu. Yds.
<br />413
<br />Shaft
<br />Backfill, 47.0 Cu. Yds.
<br />3r.�
<br />414
<br />Shaft
<br />Panel, 1 (B) Panels
<br />7S r
<br />415
<br />Shaft
<br />Panel, 2 (B) Panels
<br />'/_b o
<br />416
<br />Shaft
<br />Panel, 2 (B) Panels
<br />p -
<br />417
<br />Shaft
<br />Panel, 2 (B) Panels
<br />418
<br />Shaft
<br />Backfill, 50.0 Cu. Yds.
<br />419
<br />Stope Stope
<br />Backfill, 250.0 Cu. Yds.
<br />lqqS .
<br />428
<br />Shaft
<br />Monolithic Plug, 9 Cu. Yds.
<br />1 S/0
<br />429
<br />Stope
<br />Panels, 10 (B), 2 C -1 Beams
<br />6Sr
<br />Enter
<br />TOTAL here and
<br />on Bid Schedule, pg 1 item 2
<br />m_
<br />$ 8, 08 6
<br />
|