Laserfiche WebLink
Poverty Gulch /Gold Hill Project -- REVISED BID SCHEDULE Pg 1 of 2 <br />May 29, 1992 <br />Item Description Otv Unit Unit Price Bid Amount <br />CL: <br />1. Mob / Demob 1 JOB N/A �— <br />ex <br />2. Install Mine 1 JOB From Pg 2. y <br />Closures <br />3. <br />Install Additional <br />ao <br />q ' <br />Grating <br />100 <br />sq. ft. <br />16 u <br />/ J <br />4. <br />Install additional <br />20 <br />cu. yd. <br />CP <br />�. <br />0G <br />Polyurethane <br />y <br />C '=' <br />�� <br />S. <br />Install additional <br />200 <br />cu.yd. <br />a <br />Backfill <br />67 <br />J <br />6. <br />Additional rental hours <br />25 <br />hrs. <br />-/ /� 1 <br />C�9 91 <br />Cat 225 excavato <br />S D 799 1 G Or <br />C p <br />7. <br />Additional Panel <br />15 <br />ea. <br />! <br />S <br />placements <br />8. <br />Site M80 -004- Cat 225 <br />24 <br />hrs. <br />q1 67 <br />excavator or equivalent <br />'S.0 794 l8o t! P• <br />S� <br />Grand <br />Total, Enter here and on Invitation <br />and Bid Sheet <br />/ <br />$ 60,B-:� 7 <br />—r <br />