My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP14106
DRMS
>
Back File Migration
>
Report
>
REP14106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:08 PM
Creation date
11/27/2007 1:22:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Report
Doc Date
11/18/1997
Doc Name
1997 ANNUAL HYDROLOGIC REPORT PN C-81-034
From
MINREC INC
To
DMG
Annual Report Year
1997
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Red Canyon Mine - 1997 AHR Page 4 <br />/ /1 <br />~~'~y <br />///`l' J0.S. N <br />GROUND WATER <br />Table G-95 shows the ground water monitoring results for this water year compared to the <br />averages of previous monitoring results for the same months. The alluvial piezometers (P- <br />~1 8 P-2) showed water levels consistent with prior years averages. <br />~'he Division's letter dated March 3, 1994 requested that the wells completed in the E-~ <br />Seam be monitored to determine at what level the workings have been flooded. The 1987 <br />r~,,~~ A ual h drolo is report predicted the water in the mine workings would reach the water <br />~ evel in E-1, 635 1993. The water level in E-1 during May and September 1997 was <br />S,ip ~ 6 .2 respectively. It is unlikely this monitoring well reflects the water level <br />~ ~t,°` in the mine. According to the Hydrology and Alluvial Valley Floor Report, prepared by <br />` Kaman Tempo, well E-1 was developed to determine the water level and aquifer <br />characteristics of the E Seam. The elevation of the surface where the mine portals were <br />developed is approximately 6400. ~, ~!~ c4 r, P"'"~` ~ ~~- F,:,. ws r C~3fa' <br />The PHC predicts that a spoil aquifer with a peak discharge of 30 gpm will develop in the <br />underground waste disposal area and backfilled areas of the reclaimed topography. There <br />have never been any springs or seeps observed at the waste disposal area or reclaimed <br />mine site. There is no indication a spoil aquifer has developed in the reclaimed waste <br />disposal area or reclaimed mine site. <br />MINE WATER <br />The underground workings were not accessible for mine inflow monitoring in 1997 nor will <br />they be accessible in the future. The water level in the mine is projected to stabilize below <br />the portal according to the Kaman Tempo Report, Volume 8 of 8 of the permit application. <br />For a projection of the mine filling schedule, please refer to the 1987 Annual Hydrologic <br />Report. <br />CONSUMPTIVE USE <br />None. <br />METHODS <br />The following narrative explains the methods used to perform the current monitoring <br />requirements: <br />A Cole Parmer pocket-size tester. Range: -1.0 to 15.0 pH. Resolution: 0.1 pH. Accuracy: <br />+/- 0.1 pH. Automatic temperature compensation 0 to 50 °C. Operating temperature: 0 to <br />50 °C. Up to three point calibration 4.0, 7.0 and 10.0 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.