My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP13794
DRMS
>
Back File Migration
>
Report
>
REP13794
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:57 PM
Creation date
11/27/2007 1:18:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983058
IBM Index Class Name
Report
Doc Date
12/5/1988
Doc Name
TWIN PINES 2 MINE PN C-058-83
From
TWIN PINES INVESTMENT LIMITED PARTNERSHIP
To
MLRD
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Water was pumped from the indicated sump 24 hours/day until August 18 at <br />thF rate of 38 gpm. (ido pi:rnping occured during the week of June ~7 while <br />the mine was shut down for vacation). August 19th pumping was reduced to <br />8 hours/day due to a reduction in the sumF, level. Pio appreciable increase <br />in the sump level was noted with the reduction in pumping. For the period <br />May 23 to November 1 a total of 3,713,ODG gallons were pumped. This would <br />indicate an average inflow of less than 17gnm, as the reservoir level was <br />receeding. Suspended solids from the discharged water increased with the <br />continuation of mining in the immediate area of the sump, as would be <br />e:;pected. <br />6later level measurements and associated data for the water monitoring <br />wells for the reporting period are as follows: <br /> TFW-1 CALDIROLA N0 . 2 <br />DATE: 4/19/88 6/39/88 10/27./83 4/1Q/88 6/'9/88 10/22/88 <br />COI4DUCTIVITY 820 840 790 700 660 750 <br />PH 8.2 8.5 8.5 7.5 7.8 7.8 <br />LEVEL ~G6~ 144. 1 143. 5 147. 7 S ?C 83. D 83.6 82. 3 <br />TEMFERATURE 52 F 54 F 54 F 52 F 52 F 54 F <br />The water level in well No. TPW-1 decreased 4.0 it. from 6/29 to 10/22. <br />This is Probably related to the er_tremely dry year in the area as well as <br />reclamation of the strip mines and clay pit on the Eastern outcrop of the <br />coal seam. As previously reported before e~~ensive pumping from the mine, <br />the recovery of the well after bailing is e~aremely slow. The bailer used <br />for sampling removes about 1 quart of water. The level in the well will <br />drop the calculated distance for a 1 quart volume in the 2 inch casing. <br />This test has not been conducted for a long enough period to accurately <br />define the recovery rate. It does not appear tl-,at the level in the well <br />can be correlated to the water pumped from the mine. <br />Samples for the water quality analysis of well no. TPW-1 were taken in <br />October. The results of the analysis is enclosed. <br />Respecti .1 su i~ted, <br />Chris Reed. Presia=nt <br />TWIN PINES INVESTN~N'I' LIMITED PARTNERSHIP <br />FALCON ENERGY INC.. GENERAL PP_RTNER <br />ENCLOSURES: <br />1. P4INE FLAP, updated 11!15/99 <br />2. ENLARGED t<?~1P OF WORKING SECTIOIQ, dated 11/15/88 <br />3. A SUNLMARY OF WATER QUALITY ANALYSIS FOR TPW-1 <br />4. LABOP.ATORY TEST RESULTS FOP. TPW-1 AND MINE WATER <br />5. DAILY PU1fPIIQG LOG <br />f.. SAP'IPLE LOG FOR MINE WATER DISCHARGr. <br />7. I7F'EDS DISCHAF.GE REPORTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.