Laserfiche WebLink
Mr. Marcus Middleton - 2 - May 6, 1992 <br />Spoil Wells <br />1. All requirements were met. <br />Surface Water <br />1. All requirements were met. <br />Ponds <br />1. All requirements were met. <br />S rp ings <br />1. All requirements were met. <br />Water Quality Analysis <br />Bedrock wells, Alluvial wells, Surface water sites <br />1. All requirements were met. <br />Ponds <br />1. Site 24 and site 76 had flow 6-8 times during 1991 but TDS was not <br />taken on any samples as is required. Please explain. <br />S rp ings <br />1. All requirements were met. <br />Conclusion <br />No negative impact from mining activities at Mine 3 can be identified at the <br />present time. With the exception of a trend in Foidel Creek (likely due to <br />upstream activities) no increasing trends are apparent. Thank you for your <br />continued efforts to adhere to your approved monitoring program. <br />Sincerely, <br />%~~~~~~ <br />Kent A. Gorham <br />Reclamation Specialist <br />KAG/yjb <br />2950E <br />