My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP12996
DRMS
>
Back File Migration
>
Report
>
REP12996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:28 PM
Creation date
11/27/2007 1:04:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Report
Doc Date
2/12/2004
Doc Name
WQCD-SEP Report
From
Tom Hendricks
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />SEP Report for 2003 <br />February 04, 2004 <br />Project Number: CO-0032751 <br />By: Tom Hendricks <br />material was used to fill in historic mine surface disturbance between the <br />1880`s and 1930`x. The material was sloped to match the original contour <br />of the hill. Top soil was then placed on the slope. Both areas were then <br />seeded with a special high altitude seed miz. Seed was broadcast with a <br />standard grass seed hand crank spreader. Seeding was also <br />accomplished by band. Approximately 401bs. of seed mix was used. <br />Cost Summary for 2003 Cross Mine Project: <br />Tom Hendricks labor/engineering/contractor meetings/ <br />raking/shoveling/moving rocks/chain saw work/seeding/ <br />Documentation/clericaU <br />June 2003 <br />July 2003 <br />August 2003 <br />September 2003 <br />October 2003 <br />8 boars at $ 45.00 per hour <br />22 hours at $ 45.00 per hour <br />35 hours at $ 45.00 per hour <br />12 hours at $ 45.00 per hour <br />4 boors at $ 45.00 per hour <br />Total Labor for Tom Hendricks 81 hours <br />Top Soil and Mulch for Cross Mine SEP 30 loads <br />At 15 tons each + 450 tons at $ 20.25 ton <br />High Country Excavating Invoice # 763 <br />Ford A66 3 yard loader total hours Jnne/Sept. <br />25 hours at $100 per hour <br />High Altitude Seed Mix 40 lbs. <br />_ $ 3,645.00 <br />_ $ 9,112.50 <br />_ $ 3,950.00 <br />_ $ 2,500.00 <br />_ $ 130.00 <br />Total Expenditure to Complete Historic Cross Mine = $19,337.50 <br />Dump Reclamation 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.