My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP12345
DRMS
>
Back File Migration
>
Report
>
REP12345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:07 PM
Creation date
11/27/2007 12:52:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Report
Doc Name
1996 EASTSIDE MINE ANNUAL HYDROLOGY REPORT INFORMATION FACT SHEET
Annual Report Year
1996
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 III1111111111111 <br />999 <br />1996 <br />Eastside Mine <br />Annual Hydrology Report <br />Information Fact Sheet <br />Mine Name Eastside Mine (C-84-063) <br />Reference Map(s) Map HGP-18 <br />Hydrology Monitoring Ground water <br />Requirements (Surface -Water discharge from the mine <br />Water and Ground water) -Water seepage from under Harvey Gap dam <br /> Surface water <br /> -Harvey Gap reservoir outflow above the mine <br /> -Harvey Gap reservoir outflow below the mine <br /> -Sediment pond outflows <br />Locations of Monitoring Ground water; mine water discharge pipe is located on the <br /> reclaimed slope. See map HGP-18 for location of water seep <br /> under Harvey Gap dam. A geotechnical well was established <br /> in the alluvium to monitor the groundwater from under the <br /> refuse disposal site. The facility was never built and the well <br /> was reclaimed in 1995. Surface water; Harvey Gap <br /> Reservoir above and below the mine. NPDES Discharge <br /> Points; COG-850019 includes outflow 001 (sediment pond <br /> SP-1) and outflow 002 (sediment pond SP-2). Pond 002 has <br /> not been constructed. <br />Frequency of Monitoring Ground Water- Water discharged from the mine is <br /> monitored quarterly for estimated flow and field parameters. <br /> One sample is taken yearly of water discharged from the mine <br /> and analyzed for a full suite of chemical parameters and field <br /> parameters noted in Table 9 of the permit. Water seepage <br /> from under Harvey Gap dam is monitored quarterly for <br /> estimated flow, water temperature, pH and specific <br /> conductance. <br /> Surface Water- monitored monthly for estimated flow, <br /> temperature, conductivity and pH. A sample will be obtained <br /> on a semiannual basis and analyzed for the parameters listed <br /> on Table 9. <br /> NPDES Point- will be monitored in accordance with the <br /> permit. <br />Parameters Monitored See Table 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.