Laserfiche WebLink
<br />Mined Land Reclamation <br />TABLE I CONT'D <br />U5 <br />August, 1985 <br />July, 1986 <br />November, 1986 <br />July, 1987 <br />MEAN <br />U9 <br />August, 1985 <br />July, 1986 <br />November, 1986 <br />July, 1987 <br />MEAN <br />UA1 <br />August, 1985 <br />• July, 1986 <br />November, 1986 <br />July, 1987 <br />MEAN <br />U8 <br />August, 1985 <br />July, 1986 <br />November, 1986 <br />July, 1987 <br />MEAN <br />August 21, 1987 <br />Page 4 <br />399,019.26 1,442,446.64 7795.45 <br />399,018.62 1,442,446.76 7794.72 <br />399,018.64 1,442,446.66 7794.77 <br />399,018.71 1,442,446.67 7794.73 <br />399,018.81 1,442,446.68 7795.74* <br />401,046.18 1,442,611.96 7327.46 <br />401,045.62 1,442,612.17 7326.62 <br />401,045.61 1,442,612.05 7326.76 <br />401,045.70 1,442,612.05 7326.64 <br />401,045.78 1,442,612.06 7326.67* <br />400,502.66 1,441,153.72 7819.38 <br />400,502.27 1,441,153.70 7818.62 <br />400,502.26 1,441,153.74 7818.71 <br />400,502.42 1,441,153.67 7818.59 <br />400,502.40 1,441,153.71 7819.64* <br />Not tied in this survey <br />402,237.66 1,441,721.25 7265.90 <br />402,237.61 1,441,721.25 7265.94 <br />402,237.72 1,441,721.22 7265.89 <br />402,237.66 1,441,721.24 7265.91* <br />Slope Stability Stations at Bear #2 and Bear #3 Are Tied to D-11- <br />U and D-12-U through a series of primary loops: <br />Bear #2 U 13 <br />U 14 <br />U 15 <br />Bear #3 U 16 <br />U 17 <br />U 18 <br />U 19* <br />U 23** <br />• * Monument = #5 Rebar <br />** Monument = #7 Rebar in concrete <br />*Mean Elevation does not include August, 1985 <br />