<br />Mined Land Reclamation
<br />TABLE I CONT'D
<br />U5
<br />August, 1985
<br />July, 1986
<br />November, 1986
<br />July, 1987
<br />MEAN
<br />U9
<br />August, 1985
<br />July, 1986
<br />November, 1986
<br />July, 1987
<br />MEAN
<br />UA1
<br />August, 1985
<br />• July, 1986
<br />November, 1986
<br />July, 1987
<br />MEAN
<br />U8
<br />August, 1985
<br />July, 1986
<br />November, 1986
<br />July, 1987
<br />MEAN
<br />August 21, 1987
<br />Page 4
<br />399,019.26 1,442,446.64 7795.45
<br />399,018.62 1,442,446.76 7794.72
<br />399,018.64 1,442,446.66 7794.77
<br />399,018.71 1,442,446.67 7794.73
<br />399,018.81 1,442,446.68 7795.74*
<br />401,046.18 1,442,611.96 7327.46
<br />401,045.62 1,442,612.17 7326.62
<br />401,045.61 1,442,612.05 7326.76
<br />401,045.70 1,442,612.05 7326.64
<br />401,045.78 1,442,612.06 7326.67*
<br />400,502.66 1,441,153.72 7819.38
<br />400,502.27 1,441,153.70 7818.62
<br />400,502.26 1,441,153.74 7818.71
<br />400,502.42 1,441,153.67 7818.59
<br />400,502.40 1,441,153.71 7819.64*
<br />Not tied in this survey
<br />402,237.66 1,441,721.25 7265.90
<br />402,237.61 1,441,721.25 7265.94
<br />402,237.72 1,441,721.22 7265.89
<br />402,237.66 1,441,721.24 7265.91*
<br />Slope Stability Stations at Bear #2 and Bear #3 Are Tied to D-11-
<br />U and D-12-U through a series of primary loops:
<br />Bear #2 U 13
<br />U 14
<br />U 15
<br />Bear #3 U 16
<br />U 17
<br />U 18
<br />U 19*
<br />U 23**
<br />• * Monument = #5 Rebar
<br />** Monument = #7 Rebar in concrete
<br />*Mean Elevation does not include August, 1985
<br />
|