Laserfiche WebLink
Mr. Mike Boulay <br />Dividon ofMinemlr and Geology <br />• Page 2 <br />4. Page 5 inc&cater that anru nvegetated prior to 2003 are rhown on a map in the exhibitr rection of thin report. There it no rush map <br />contained in this report. Pkare revue page 5 accnrdingl~ and provide the coma reference and map. <br />Response. SCC's copy of the 2003 Reclamation Map shows all areas reclaimed prior to 2003 shaded with diagonal <br />light green lines. The reference to the map has been clarified. <br />5. Under Sediment Pond Surveyr on page 5, SCC nferencer Rule 4.05.6(11 J(c). Our ruler are occarionally updated and this it au <br />inromc7 reference, ar the rule doer not exist. Pkare coma this dinrepancy and make reference to the coma rule. Alro, it would be <br />ur ful to add a dircurrion of the annual cert~ed reportr required for all impoundmentr under Auk 4.04.9(14) to this page afthe report. <br />Response. As required by Rule 2.04.13 Annual Reclamation Report: <br />(1) By February 15, or other such date as agreed upon, each permittee shall file and annual reclamation report covering <br />the previous calendar year for all areas under bond. The report shall include, but not be limited to, text, discussion <br />and maps which address: <br />(a) The name and address of the pemrittee and permit number; <br />(b) Location and number o£ acres disturbed during that year, <br />(c) Location and number of acres backfilled and graded during that yeaz, <br />(d) Location and number of acres topsoiled during that year, <br />(e) The speaes, location and number of acres of vegetation planted during that year, including any augmented <br /> seeding or cultural practices; and <br />• <br />(f) Location, number of acres and date of planting for all previously xevegetated areas. <br />(2) The petmittee may provide additional monitoring information as required by the approved permit <br />As presented in Tab 13, Annual Reporting, SCC has committed to providing the additional information as put of the <br />Annual Reclamation Report; <br />• Annual herbidde applications and weed and pest control measures <br />• Annual topsoil balance tepotttng <br />• SoIl and spoil sampling results <br />• Revegetation monitoring <br />• Wildlife monitoring (when conducted) <br />• Results of sediment pond surveys (when conducted) <br />I • <br />• As-built designs for stock tanks constructed during the reporting year <br />SCC provides a certified Annual Report specifically addressing sediment and stock ponds. <br />6. Under the Stack Tank dircurrion contained on page 6, then it no nferznce to the permanent mock pondr that have been permitted <br />Then rhould be a brief dircurrion and information pertaining to the required annual certified in.rpectionr reporir far all mock pondr. <br />Pleare incorpamte a brief dircurrion of the permanent stock ponds and nruttr of the annual cert~ed in pectionr. <br />Response. SCC provides a certified Annual Report specifically addressing sediment and stock ponds. <br />7. On page 6 under Sediment Survey Aerultr, the unitr for remaining capacity are mirrin8. Pleare update thin information with the coma <br />units. <br />Response. The units of measure have been included. <br />