My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP12125
DRMS
>
Back File Migration
>
Report
>
REP12125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:00 PM
Creation date
11/27/2007 12:49:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Report
Doc Date
3/28/2005
Doc Name
2003 ARR Response to Adequacy Comments
From
Seneca Coal Company
To
DMG
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHRONOLOGICAL HISTORY OF REVEGETATION <br />• Areas revegetated prior to 2003 at the Seneca II Mitte are shown on the Seneca II 2003 Reclamation Map in the <br />exhibits section of this report. Chronological History of Revegetation Activities in the 1995 Annual Reclamation <br />Report, SCC 1996. Areas revegetated during 1997, 1998 and 1999 are shown on drawing 5299-4, 1999 Annual <br />Reclamation Report. Areas seeded in 2003 aze shown on the Seneca II 2003 Reclamation Map. <br />SEDIMENTATION POND SURVEYS <br />SCC is required by Permit C-80-005 to monitor sedimentation ponds for sediment storage capacities. This schedule <br />provides a sediment yield history and gives advance warning to operations personnel when sediment clean-out work <br />is required. In accordance with Rule 4.05.9(17), SCC visually inspects each pond a minimum of quarterly each yeaz. <br />During these inspections, any drastic change in sedimentation storage or sudden increase in a sediment delta at the <br />inlet to the pond could be detected which would require mitigation. <br />• Based on the 2003 survey, all sediment ponds have sufficient sediment storage. Additionally, all ponds have been <br />discharging in compliance with the approved NPDES permit effluent limitations. Yearly sediment delivery estimates <br />to the ponds are considerably less than originally calculated, especially since the majority of the azeas in these <br />watersheds have now been reclaimed and revegetated. <br />See 2003 Annual reclamation report for latest calculated annual sediment deliveries. Following the data shows 2003 <br />surveyed capacities of Seneca II sediment pond: <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.