Laserfiche WebLink
~~~ Geo-Coo <br />• DAII.Y INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 1!30/2007 5 Iv~ W R F S Weather. Suety Temp: 3-21 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (SF) = O.O <br />TOTAL AREA TO DATE (SF) = 307,SS8.0 <br />BENTONTTE FOR SLl1RAY TODAY (BAGSrI'ONS) = I O.O / ) S.O <br />BENTONITE FOR SLi1RRY TO DATE (BAGSQ'ONS) = 67S.O / 1 O 12.$ <br />BENTONTFE FOR DRY ADDTTION TODAY (BAGSJTONS) = 4.O / 6.0 <br />BENTONITE FOR DAY ADDITION TO DATE (BAGS/EONS) = 3S6.O / $34.0 <br />CEMENT FOR DRY ADDr170N TODAY (BAGSrI'ONS)= O.O O.O <br />CEMENT ADDrf10N TO BACKFILL TO DATE (BAGS/fONS)= 131.0 163.8 <br />WATER USACE AT BATCH PLANT (GAL TODAY/ro DATE) 1 I O,SOO / 4,326,741 <br />• 2. Results ofdnspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: <br />No backfdl'm¢, rat all tests <br />4. Verbal Instructions Received: <br />Sce Attached <br />5. Remarks: D. Gayer 40' of orig'vral cut from 1+50 to 1+20 <br />Resumed shiny wall excavadoq m backinling <br />Top of key ideffiifed on origiaal depth on Nov 9, O6 <br />Bottom of key based on boring log <br />First day back on ahnry wan production since 1/11/07 <br />6. Safety: No <br />CONTRACTOR CERTTFICATTON: I certify that We above report is complete and correct and that aU <br />material and egtipmem used, work performed and test conducted druiog this reporting period were m <br />strict compliame with the contract plarra and specifrcaliom except as rated. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Page t of i <br />