My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-COO <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 1/122007 S M T W I~S Weather: Suety Temp: <br />1. Work Performed: Summary. see addition attached <br />AREA TODAY (SF) = O.O <br />TOTAL AREA TO DATE (SFI = 3O7,SSS.O <br />BENTONTTE FOR SLURRY TODAY (BACSl1'ON~ _ 7.0 / 10.5 <br />BENTONITE FOR SLURRY TO DATE (BAC,S/FONS) = 632.0 / 948.0 <br />BENTONITE FOR DRY ADDITION TODAY (BAC.W/'ONS) = O.O / O.O <br />BENTONITE FOR DRY ADDfC10N TO DATE (BAGSR'ONS) = 3$3.0 / 529.5 <br />CEMENT FOR DRY ADDITION TODAY (BAGS~TONSp O.O O.O <br />CEMENT ADDITION TO BACKFD.L TO DATE (BAG.S/I'ONSy= 131.0 163.8 <br />WATER USACE AT BATCR PLANT (GAL TODAYfIO DATE) 49,700 / 4,083,341 <br />• 2. Results of Inspedion: See Attached <br />3. Tests Requited by Plans and/or Specs and Resuhs: See Attached <br />4. Verbal Instructions Received: <br />5. Remarks: D. Gayer 0' <br />D. Wren dug 0' <br />No digging until rock Trershing submmracmr is finished <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATTON: I certify that the above report is complete and correct and that all <br />material and equipment used, work performed am test corducted during this repoRiog period were m <br />strict cempliame with the conduct plum end specificetims except as mted. <br />Geo-Con <br />r1 <br />LJ <br />inspector/ Engineer/ Owner <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.