Laserfiche WebLink
~~~ Geo-Con <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA $AYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Dale: 1!4!2007 S M T W®F S Weather: Suety Temp: 24fi3 <br />1. Work Performed: Sutnmarv_ see addition attached <br />AREA TODAY (SF) _ ~ S,94S,O <br />TOTAL AREA TO DATE (SF)= 289,9$8.0 <br />BENTONITE FOR SLURRY TODAY (BAGSlTONS) = Zb.O / 39.0 <br />BENTONrI'E FOR SLURRY TO DATE (BAGS/rONS) _ $92.0 / 888.0 <br />BENTONITE FOR DRY ADDITION TODAY BAGS/TDNS) = 6.0 / 9.0 <br />BENTONITE FOR DRY ADDITION TO DATE (BAGS!rONS) = 3ZZ.O / 483.0 <br />CEMENT FOR DRY ADDrTION TODAY (BACSlrONS)= O.O O.O <br />CEMENT ADDITION TO BACKFILL TO DATE BAGS?ONS~ 131.0 1 b3.8 <br />WATER USAGE AT BATCH PLANT (GAL TODAYITO bATE) 1$2,$00 / 3,842,141 <br />2. Resulu oflnspection: See Attached <br />• 3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal Inswctions Received: <br />5. Remarks: D. Grayer 240' <br />D. Wren dug 70' <br />6. Safety: No Safety issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and that aU <br />material aid equipment used, work performed and test conducted during Ibis reportvtg period were in <br />strict compliance with the coact pleas and specification except as noted. <br />Geo-Con <br />. Inspector/ Engineer! Owner <br />Page / of 1 <br />