My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ Geo-Con <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA $AYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Dale: 1!4!2007 S M T W®F S Weather: Suety Temp: 24fi3 <br />1. Work Performed: Sutnmarv_ see addition attached <br />AREA TODAY (SF) _ ~ S,94S,O <br />TOTAL AREA TO DATE (SF)= 289,9$8.0 <br />BENTONITE FOR SLURRY TODAY (BAGSlTONS) = Zb.O / 39.0 <br />BENTONrI'E FOR SLURRY TO DATE (BAGS/rONS) _ $92.0 / 888.0 <br />BENTONITE FOR DRY ADDITION TODAY BAGS/TDNS) = 6.0 / 9.0 <br />BENTONITE FOR DRY ADDITION TO DATE (BAGS!rONS) = 3ZZ.O / 483.0 <br />CEMENT FOR DRY ADDrTION TODAY (BACSlrONS)= O.O O.O <br />CEMENT ADDITION TO BACKFILL TO DATE BAGS?ONS~ 131.0 1 b3.8 <br />WATER USAGE AT BATCH PLANT (GAL TODAYITO bATE) 1$2,$00 / 3,842,141 <br />2. Resulu oflnspection: See Attached <br />• 3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal Inswctions Received: <br />5. Remarks: D. Grayer 240' <br />D. Wren dug 70' <br />6. Safety: No Safety issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and that aU <br />material aid equipment used, work performed and test conducted during Ibis reportvtg period were in <br />strict compliance with the coact pleas and specification except as noted. <br />Geo-Con <br />. Inspector/ Engineer! Owner <br />Page / of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.