Laserfiche WebLink
~~~ Geo-Con <br />• DAILY INSPECTIONlQUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />~(G77EO-CON PROJECT NO. POS-003 <br />Date: 1/3/2007 S M T LNl R F S Weather: Stymy Temp: 19-50 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAV (SF) _ ~ O.O <br />TOTAL AREA TO DATE (SFj = 284,0 I3.0 <br />BENTONITE FOR SLURRY TODAY (BAGS/IONS) = 14.0 / 21.0 <br />BENTONITE FOR SLURRY TO DATfi (BACSrTONS) = S66.O / 849.0 <br />BENTONI'rE FOR DRY ADDITION TODAY (BACSITONS) = 6.O / 9.O <br />BENTONITE FOA DRY ADDITION TO DATE (BAGSITONS) = 322.0 / 483.0 <br />CEMENT FOR DRY ADDITION TODAY (BAGSVI'ONS}= O.O O.O - <br />CEMENT ADDITION TO BA['KFn i TO DATE (BAGS/rONS}= 131.0 163.8 <br />WATER USAGE AT BATCH PLANT (GAL TODAY/r0 DATE) 6S,SOO / 3,659,641 <br />2. Results of Inspection: See Attached <br />• 3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal Instructions Received: <br />5. Remarks: D. Gayer 0' <br />D. Wren dart 0' <br />No digging, moving smw around job all day <br />E-21 started digging wells by gas tmc will dig 6 total <br />Trencher being put toge0ter, should start digging Tuesday 1/9!07 <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct end that atl <br />material and equipmem used, work performed and test conducted during this reporting period were m <br />strict compliame with the oammct plans a~ specifications except as mted. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Paae ~ w ~ <br />