My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-Con <br /> <br />DAH,Y INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 1/8/2007 5~ T W R F S WeaWer. Sutmy Temp: 14-58 <br />1. Work Performed: Sttmmary, see addition attached <br />AREA TODAY (SF) = 2,030.0 <br />TOTAL AREA TO DATE (SF) = 302,198.0 <br />BENTONITE FOR 9LI)RRY TODAY (SAGS7'ONS) = 3.O / 4.S <br />BENTONIT'E FOR SLURRY TO DATE (BACSITONS) = 603.0 / 904.$ <br />BENTONI'rE FOR DRY ADDITION TODAY (BAGS/1'ONS)= O.O / O.O <br />BENTONITE FOA DRY ADDITION TO DATE (BAGSfrONS) = 337.0 / SOS.$ <br />CEMENT FOR DRY ADDITION TODAY (BAGSlfONS)= O.O O.O <br />CEMENT ADDI770N TO BACKF'fI,L TO DATE (BAGSITONS)= 131.0 163.8 <br />WATER USAGE AT BATCH PLANT (GAL TODAYITO DATE) O / 3,$9$,041 <br />• <br />2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />4. Verbal Instructions Received: <br />$. Remarks: D. Gayer 0' <br />D. Wren dug 80' <br />Tied in both trenches at station 82+00 <br />Trencher in positioq started at 1+30, tenable to dig, need to backirll before he cao start. <br />6. Safety: No Safety Lssces. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct aad that all <br />material and equipment used, work performed and test conducted diving this reporting period were in <br />strict compliance with the contract pleas and specification except as rated. <br />Geo-Con <br />• <br />Inspector/ Engineer/ Owner <br />Page t of t <br />
The URL can be used to link to this page
Your browser does not support the video tag.