Laserfiche WebLink
Geo-Con <br />• DAILY INSPECTIONlQUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. PITS-003 <br />Date: 2/23/2007 S M T W R^F S Weather. Suety Temp: 32-45 <br />1. Work Performed: Summarv_ see addition attached <br />AREA TODAY (SF) = S,1 I S.O <br />TOTAL AREA TO DATE (SF) = 359,163.0 <br />BENTONITE FOR SLURRY TODAY (BAGSJI'ONS) = S.O ! 7.S <br />BENTONrfE FOR SLURRY TO DATE (BAGS~TONS) = 738.0 / 1107.0 <br />BENTONI7'E FOR DRY ADDITION TODAY OIAGS/I'ONS) = 2.O / 3.O <br />BENTONTTE FOR DRY ADDITION TO DATE (BAGSlI'ONS) = 396.0 / $94.0 <br />CEMENT FOR DRY ADDTTION TODAY (BAGS/rONS)= O.O O.O <br />CEMENT ADD[770N TO BACKFn,L TO DATE (BAGSITONS)= 131.0 163.8 <br />WATER USAGE AT BATCB PLANT (GAL TODAY/f0 DATE) 48,700 / 4,41$,241 <br />• 2. Results oflnspection: <br />See Attached <br />3. Tests Required by Plans and/or Specs and Results: <br />4. Verbal Instructions Received: <br />See Attached <br />5. Remarks: Dug around Gas Xiug. Tom Swallow observed end all cleaz. <br />Dormie dui 170' <br />6. Safety: No Safety Issues. <br />CON7"RACTOR CERTIFICATION: I certify that the above report is complete and cersect and that all <br />material and equipment used, work performed and test conducted dur'ug this reporting period were in <br />strict comp6aace with the coNroet plans and specifications except as rated. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Pape 1 of 7 <br />