My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11871
DRMS
>
Back File Migration
>
Report
>
REP11871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 2 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-Con <br />• DAILY INSPECTIONlQUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. PITS-003 <br />Date: 2/23/2007 S M T W R^F S Weather. Suety Temp: 32-45 <br />1. Work Performed: Summarv_ see addition attached <br />AREA TODAY (SF) = S,1 I S.O <br />TOTAL AREA TO DATE (SF) = 359,163.0 <br />BENTONITE FOR SLURRY TODAY (BAGSJI'ONS) = S.O ! 7.S <br />BENTONrfE FOR SLURRY TO DATE (BAGS~TONS) = 738.0 / 1107.0 <br />BENTONI7'E FOR DRY ADDITION TODAY OIAGS/I'ONS) = 2.O / 3.O <br />BENTONTTE FOR DRY ADDITION TO DATE (BAGSlI'ONS) = 396.0 / $94.0 <br />CEMENT FOR DRY ADDTTION TODAY (BAGS/rONS)= O.O O.O <br />CEMENT ADD[770N TO BACKFn,L TO DATE (BAGSITONS)= 131.0 163.8 <br />WATER USAGE AT BATCB PLANT (GAL TODAY/f0 DATE) 48,700 / 4,41$,241 <br />• 2. Results oflnspection: <br />See Attached <br />3. Tests Required by Plans and/or Specs and Results: <br />4. Verbal Instructions Received: <br />See Attached <br />5. Remarks: Dug around Gas Xiug. Tom Swallow observed end all cleaz. <br />Dormie dui 170' <br />6. Safety: No Safety Issues. <br />CON7"RACTOR CERTIFICATION: I certify that the above report is complete and cersect and that all <br />material and equipment used, work performed and test conducted dur'ug this reporting period were in <br />strict comp6aace with the coNroet plans and specifications except as rated. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Pape 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.