My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11734
DRMS
>
Back File Migration
>
Report
>
REP11734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:48 PM
Creation date
11/27/2007 12:45:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
10/12/2006
Doc Name
3rd Quarter 2006 Review Letter
From
DRMS
To
Twentymile Coal Company
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Colorado 80203 <br />Denver C O L O R A D O <br />, DIVISION O F <br />Phone: (303) 866-3567 RECLAMATION <br />FAX: (303) 832-8106 M I N I N G <br /> - &- <br /> SAFETY <br />Interoffice MEMORANDUM Bill Owens <br />Governor <br />Russell GeoBe <br />to: C-1982-056, Coal Refuse Pile Inspection Report Executive Director <br />cc: Jerry Nettleton, Twentymile Coal Company, 29515 RCR #27, Oak Creek, ~A180~~a~r <br />Brian D. Len, Northwest Colorado Consultants, Inc., 2580 Copper Ridge ~a~dK~eerTrustee <br />Box 775226, SteambogYSprings, CO 80477 <br />from: Byron G. Walker. <br />subject: Review of the 3`d Quarter 2006 Refuse Pile Inspection Report, Foidel Creek Mine, C- <br />1982-056 <br />date: October 12, 2006 <br />Table of Contents <br />Table of Contents <br />Rule 4.09.1(11)(a) ...................................................................... ..................................................... I <br />Rule 4.09.1(11)(c) ...................................................................... .....................................................2 <br />Rule 4.10.1(1) ............................................................................ ..................................................... 2 <br />Rule 4.10.1(1)(b) ........................................................................ ..................................................... 2 <br />Rule 4.10.2(1) ............................................................................ ..................................................... 2 <br />Rule 4.10.2(2)(a) ........................................................................ ..................................................... 2 <br />Rule 4.10.2(2)(b) ........................................................................ ..................................................... 3 <br />Rule 4.10.2(2)(c) ........................................................................ ..................................................... 3 <br />Rule 4.10.2(2)(d) ........................................................................ ..................................................... 3 <br />Rule 4.10.2(3) ............................................................................ ..................................................... 3 <br />CDRMS Policy Memorandum, 7/13/84 .................................... ..................................................... 3 <br />Rule 4.09.1(1 I)(a) The fill shall be inspected for stability by a registered engineer or other <br />qualified professional specialist experienced in construction of earth and rockfall embankments <br />under the direction of a qualified professional engineer at least quarterly throughout the <br />construction and during the following critical construction periods: (1)removal of all organic <br />material and topsoil, (2)placement of underdrainage systems, (3) installation ofsurface drainage <br />systems, (4) placement and compaction offill materials, and (5) revegetation. <br />The subject inspection was a quarterly inspection accomplished throughout construction, not one <br />of the critical construction periods. A registered engineer signed the report. <br />Rule 4.09.1(11)(b) The qualified registered engineer shall provide to the Division a certified <br />report within 2 weeks after each inspection that the fill has been constructed as specif ed in the <br />Office of Office of <br />Mined Land Reclamation Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.