My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11708
DRMS
>
Back File Migration
>
Report
>
REP11708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:47 PM
Creation date
11/27/2007 12:44:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Report
Doc Date
9/13/2005
Doc Name
2005 Erosion Inventory Report
From
WWC Engineering
To
DMG
Permit Index Doc Type
Stability Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Block 8: contains live-handled roto-cleared topsoil (1994) that was seeded in (1995). One repair has <br />been made in this block since 1994: <br />• 1997 -Repaired and reseeded gully on lower slope south of Downdrain 4. <br />• No repairs have been needed in this block since 1997. <br />' Block 9: contains live-handled roto-cleared topsoil {1994) that was seeded in 1995. Two repairs have <br />been made in this block since 1994: <br />• 1996 -Repaired and reseeded gullies along the lower slope. <br />' • 1997 -Repaired and reseeded gullies on upper slope caused by runoff from work on Lower Moffat <br />Road. <br />• No repairs have been needed in this block since 1997. <br />' Block 10: contains stockpiled topsoil (1996) and was seeded in 1996. This block was also contour- <br />furrowed. Four repairs have been made in this block since 1996: <br />' • 1997 -Repaired and reseeded several gullies at various locations in this block. Repair azeas <br />included the following locations: the northwestern most edge; the central upper and lower portion of <br />the block where gully drainage entered into the Moffat final pit drainage channel; along <br />' Downdrain 4; along the western edge of the reclaimed Middle Moffat Haul road in the vicinity of <br />Downdrain 2; and, along the western edge of the reclaimed shoulder of the narrowed Lower Moffat <br />Road. <br />' • 1998 -Repaired and reseeded gullies along hillslope that drains into the final pit drainage. <br />• 1999 -Repaired sections of the Final Pit Downdrain and Downdrain 4. Roughed-up and seeded the <br />' new gully activity associated with the Final Pit Downdrain. Repaired gullies and installed contour <br />furrows north of Final Pit Downdrain. <br />• 2001 -Repaired gully from the Center Haul Road along the south side of the ridge to the Lower <br />' Moffat Road; along the south side of the Lower Moffat Road; adjacent to the Moffat Final Pit <br />Segment 4 Ditch; and, adjacent to the Final Pit Segment 3 Ditch. <br />• No repairs have been needed in this block since 2001. <br />3.2 West Midge Monitoring Blocks <br />Nine (9) blocks have been inventoried for erosion features since 1995. The West Ridge terraces <br />that make up these blocks aze performing as anticipated. Existing gullies located primazily on older non- <br />topsoiled reclamation show no sign of activity and seem to be stabilizing with vegetation establishing <br />along the sides and bottoms. A brief description of past repairs for each block is presented below. <br />Block 1-6: Two repairs have been made since 1995. <br />• 2002 -Repaired and seeded gully. <br />• 2004 -Repaired terrace. Repaired and seeded gully. <br />• No repairs have been needed in this block since 2004. <br />Block 6-7: Three repairs have been made since 1995. <br />• 1996 -Repaired gully. <br />• 2002 -Repaired gully. <br />• 2004 -Repaired terrace. Repaired and seeded gully. <br />• No repairs have been needed in this block since 2004. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.