Laserfiche WebLink
1999 Annual Reclamation Report -Southfield Mine <br />Page 2 <br />Additional Monitoring_Information <br />In accordance with the approved vegetation monitoring program, EFCI performed interim <br />vegetation sampling on the refuse disposal area. Vegetation sampling was completed on the azeas <br />planted in 1/92 and 11/92, shown on attached Figure 1, Refuse Disposal Area. Results of <br />sampling on both areas indicate that vegetation is generally establishing as predicted in the <br />permit application. <br />Backfilled. Graded. and TQpsoiled Areas Summary <br />Reclamation activities completed during the reporting period are listed below in Table 1, 1999 <br />Reclamation Summary. <br />TABLE 1 <br />1999 MINE STYE RECLAMATION SUMMARY <br />Date <br />Completed Reclamation Activity Completed Area/ Volume <br />3/99 Drill re-seed portions of east and west Loadout Area 13.6 acres <br />12/99 Drill seed and Mulch reclaimed area on Refuse Disposal 4.1 acres <br /> Area. <br />Conclusions <br />EFCI is accomplishing contemporaneous reclamation of the refuse pile area in compliance <br />with the permit application. The current reclamation process effectively minimizes the total <br />disturbance and promotes establishment of the site to its approved postmining land use <br />capabilities. <br />