Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 2 Mine <br />I •2001 Annual Hydrology Report <br />DH-67b1w <br />- 360' <br />Elevation <br />to Water ~ <br />• <br />Elevation -6450.5 <br />Inalysis for this point due to tow flows ar <br />luring this period or as noted above <br /> <br />Ground Water <br />10/122(x10 to Present <br />Baseline <br />Mtn Max Avg <br />63938 6150.5 fi9II,1 <br />OA %.1 38.1 <br />8.1 e.l fi.l <br />3330.0 3330A 23D,0 <br />ll.9 13A 13.1 <br />There Is no lab anah/sls ror <br />Mis polo[ tlue to low flows <br />or Water level tlunng Mls <br />penod. <br />Operational <br />• Baseline Information Collection initiated on 10!72/2000 and not yet considered complete aflar monhadng for-14 months. Point OH-67biw has not been influenced by minin <br />The monitoring point location for DH-67biw is located along Hubhard Creak trail, near iha mouth of Dove Gulch. This hole is completed helow the D coal seam, <br />Hubbard Creek - Montfort <br />0628101 <br />MDL =Method Determination Limit BLANK= Not Tested Monitoring Point Table 102 <br />Required by eurtant permit. <br />