Laserfiche WebLink
Bowie Resources Limited <br />Bowieido. 2 Mine <br />I •2001 Annual Hydrology Report <br />DH-67abv Hubbard Creek - Monitori <br />Elevation - 6460.5 <br />Ground Water <br />10/122000 to Present <br />Baseline <br />Operational <br />Min Max Avg <br />6388 fi4605 69118 <br />o.o n.T 3Ba <br />BS 9.5 B.6 <br />3.9 Z.9 3.9 <br />10.6 10.fi 106 <br /> <br />malysls for this point due to low flows or <br />luring this period or as noted above <br /> <br />There Is rro lab analysis Tor <br />this point due to low Flows <br />or water level during this <br />period. <br />• Baseline Information Collection initiated on 10/12/2000 and not yet wnsidered complete after manhodng for-14 months. Point DH-67abv has not been in0uaneed by minin <br />The monitoring point location for DH~7abv is located along Hubbard Creek trail, near the mouth of Dove Gulch. This hole is completed above the D coal seam. <br />MDL =Method Determination Limit BLANK =Not Tested Monitoring Point Table 101 <br />Required by current permit. <br />