Laserfiche WebLink
<br />TABLE 1 (Continued) <br />HYCRDLOGIC hANITORING SITES <br />WATER LEVEL MEASURE7~17VTS <br />SITE h1JNITORING FREQUENCY <br />Water Level Only <br />Foidel Creek <br />14 Monthly (1), (z) & (3) <br />8 hbnthly (1), (z) & (3) <br />304 Nbnthly (I) & (z) <br />Fish Creek <br />16 Nbnthly (1), (z) & (3) <br />302 hbnthly (During Irrigation) (1)(4) <br />• 307 hbnthly (1) & (z) <br />loot Ma,tnty (1) (z) ~ (3) <br />Notes: <br />(1) Included with Twentyrnile Coal Carpany's hydrologic monitoring program. If site is <br />reroved from TCC's program and continued monitoring is required, CYCC will monitor <br />site: <br />(z) Nbnthly measurem~ts for rater level collected during ice free months: late March <br />or early Apri] through Septerber. <br />(3) These sites are also carponents of wrface stream flaw rronitoring program. <br />(4) First headgate of irrigation ditch downstream of mine discharge. Monitoring to <br />begin once Fish Creek Dewetering Facility is functioning. <br />• <br />