My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11005
DRMS
>
Back File Migration
>
Report
>
REP11005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:40:22 PM
Creation date
11/27/2007 12:33:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Report
Doc Date
3/18/1996
Doc Name
1994 AHR TABLE TITLE PAGE TO TABLE 32
Annual Report Year
1994
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--~ <br />TABLE 1 (Continued) <br />HYDROLOGIC hDNITORING SITES <br />SPOIL WELLS AND SPOIL SPRINGS <br />SITE MJNITORING FREQUENCY CCM~MS <br /> Water Level Water Quality <br /> or Flaw & Field Sampling <br /> Parameters <br />Foidel Creek <br />USGS 09243800 hbnthly Quarterly (1) & (2) <br />14 Monthly Quarterly (3) <br />8 Monthly Quarterly (1) & (2) <br />USGS 09243900 hbnthly Quarterly (2) <br />Middle Creek <br />l1CzSG 09243700 Monthly Quarterly (2) <br />Fish Creek <br />16 Monthly Quarterly (1) & (2} <br />302 Monthly Monthly During irrigation <br /> season only; (1), (4) <br />1002 hbnthly Quarterly (1) & (2) <br />Trout Creek <br />~~ Monthly Nunthly During irrigation <br />season only; (1) <br />69 Monthly Monthly During irrigation <br />season only; (1) <br />Notes: <br />(1) Included with Twpntyrtrile Coal Carpany's hydrologic monitoring program. If site is <br />remved fran TCC's program and continued monitoring is required, CYCC will monitor <br />site. <br />(2) Sampling will be perfonmd on a flexible schedule throughout nonTal flow period, March <br />through Septerber. Within this time frame, flaw and field parameters will be neasured <br />twelve (12) times and four (4) full suite analyses will be conducted. <br />(3) Monthly field samples when flowing; 4 monthly lab sartples obtained once runoff begins. <br />• (4) First headgate of irrigation ditch downstream of mine disrJwrge. Mnitoring to begin once <br />Fish Creek Dewatering Facility is functioning. <br />
The URL can be used to link to this page
Your browser does not support the video tag.