My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP10685
DRMS
>
Back File Migration
>
Report
>
REP10685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:40:06 PM
Creation date
11/27/2007 12:30:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Report
Doc Date
7/15/2002
Doc Name
2002 Erosion Inventory Report
From
WWC Engineering
To
DMG
Permit Index Doc Type
Stability Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Block 1 contains live-handled roto-cleared topsoil (1992) that did not receive additional seeding <br />as a test block for the reintroduction of native plant species on live-handled roto-cleared topsoil. <br />• Repair of single gully on northern portion of Block (1994). <br />• A portion of the northern section of Block received interseeding in 1995 as described in the <br />1995 Annual Reclamation Report. <br />Block 2 contains live-handled roto-cleared topsoil that was seeded in the spring of 1993. <br />• 1995 -Gully shaped and matted, Downdrain 3. <br />1998 - Downdrain 3 was reconstructed and riprapped. <br />Block 3 contains live-handled roto-cleared topsoil (1993) that was seeded in the spring of 1994. <br />• 1996 -Lower slope area redisturbed to blend into Lower Moffat Road; gullies in redisturbed <br />area repaired and reseeded during the reshaping activity. <br />Block 4 contains live-handled roto-cleared topsoil (1993) and was not seeded to further the trial <br />azea started with Block 1. <br />• 1995 - At midpoint of Block, a portion was interseeded and livestock imprinted. <br />• 1996 - Gully repair and seeding on lower slopes at midpoint of block where previous <br />livestock imprinting efforts where considered insufficient. <br />~, Block 5 contains live-handled roto-cleared topsoil (1993} that was seeded in the spring of 1994. <br />• 1995 -Gullies repaired in conjunction with construction of Downdrain I . <br />• 2001 -Gully repair and seeding south of Moffat Down Drain #2. <br />Block 6 contains live-handled roto-cleared topsoil (1993) that was seeded in the spring of 1994. <br />' • 1996 -Gully repaired and reseeded on lower slope. <br />• 1997 -Gullies caused by runoff from Lower Moffat Road narrowing activities repaired and <br />' reseeded on upper slope. <br />• 2001 -Gully repair and seeding south of Moffat Down Drain #1. <br />Block 7 contains live-handled roto-cleared topsoil (1994) that was not seeded as part of the test <br />practice employed in Blocks 1 and 4. <br />• 1995 -Gully repaired and reseeded on lower slope. <br />Block 8 contains live-handled roto-cleared topsoil (1994) and was seeded in (1995). <br />• 1997 -Gully repaired and reseeded on lower slope south of downdrain 4. <br />Block 9 contains live-handled roto-cleared topsoil (] 994) and was seeded in 1995. <br />• 1996 -Gullies along the lower slope repaired and reseeded. <br />• 1997 -Gullies caused by runoff from Lower Moffat Road narrowing activities repaired and <br />reseeded on upper slope. <br />3 W <br />WC Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.