Laserfiche WebLink
Site Reclamation Activity <br />April 2005 - March 2006 <br />Page 5 <br /> <br />Activity planned for 2006 includes; <br />1) monitoring and maintenance of the vegetation. <br />MONITORING - Water Quality <br />Included in Appendix A is water quality data for; <br />1) Mayflower Millsite area <br />a) Animas River above (AR3.5) and below (AR4) complex. <br />b) monitoring wells on the banks of the Animas River down <br />gradient the Engineering Office Site project area (EOMW1 <br />and EOMWZ). <br />2) American Tunnel area <br />a) Cement Creek above (CC1) and below (CC2)complex. <br />b) Springs in the area of the now reclaimed waste dump <br />(ATS1, ATS2). These springs no Longer flow from their <br />original sites because of the waste dump reclamation and <br />are no longer sampled. <br />3) Eureka'Creek between Sunnyside Basin and the Terry Tunnel <br />(EC1) . <br />