Site Reclamation Activity <br />April 2005 - March 2006 <br />Page 4 <br />TAILINGS POND No.4 - Plate No. 3 <br />During the 2005 reporting year no additional acreage was disturbed <br />although four cells were developed in a previously reclaimed area <br />to hold and contain the sludge excavated during reclamation of the <br />American Tunnel settling ponds. Three of these cells were recapped <br />upon completion of the work. The fourth was left open in case it is <br />deemed necessary to haul any reclamation waste to Tailings Pond #4 <br />while reclaiming the remainder of the American Tunnel permit area <br />in 2006. <br />Activity at this site consisted of; <br />1) excavate four cells to hold the settling pond sludge from the <br />American Tunnel reclamation project. The cap material was <br />salvaged for replacement after work completion. The material <br />from the cells was used to extend the NE interior slope. Three <br />of the cells were capped, at the end of the construction <br />® season. The fourth was left open to accept any material that <br />may need to be hauled from the American Tunnel reclamation <br />project during the 2006 construction season. <br />2) monitoring and maintenance of the vegetation. <br />Planned activity for 2006 includes; <br />1) monitoring and maintenance of the vegetation, including weed <br />control. <br />2) Repair any settlement of the three closed cells and close the <br />fourth cell after it is certain no more material will be <br />hauled from the American Tunnel reclamation project. <br />3) grade and complete capping of the extended NE interior slope. <br />4) seed and mulch the cell area and extended slope area. <br />OFFICE SETTLING PONDS - Plate No. 3 <br />Activity at this site for 2005 consisted of; <br />1) monitoring and maintenance of the vegetation. <br /> <br />